ABP Scaffolding ABP Scaffolding

Widely Used Steel Cuplock Scaffolding System Top / Bottom Cup with Ledger Blade

Product Description

Widely used steel cuplock scaffolding system top / bottom cup with ledger blade

The Cuplock Scaffolding Top Cup is a fundamental component in the construction field. It plays a crucial role in securely connecting vertical standards and horizontal ledgers in cuplock scaffolding systems. The cuplock blades are welded ends of cuplock scaffolding ledger, which can be inserted in the top cups of the cuplock standard.

Cuplock Scaffolding Top Cup
Product Specifications
Key Feature Details
Material Steel Q235
Surface Treatment Hot Dip Galvanized
Standard EN74/BS1139/AS1576
Certificate CE Certificate / SGS
Payment Term TT / L/C
Detailed Photos
Scaffolding Detail 1
Scaffolding Detail 2
Scaffolding Detail 3
Scaffolding Detail 4

Cuplock scaffolding is a mature system. It mainly composes of standard, ledger, brace, plank and so on. Cuplock node is revolutionary, making it faster and easier to erect than any other scaffolding. It uses the "Cup" and "Blade" to lock the vertical and horizontal together by rotating the top cup. On the standard, each top cup has a limited position pin to ensure the ledger is locked tightly at the right place.

Cuplock Joint Detail

Cuplock Scaffolding System joint structure is reasonable, with a simple production process, easy operation, and a wide range of use. Compared with traditional scaffolding, it has remarkable strength and stability features.

Cuplock Scaffolding Features
Feature Description
Easy to StandNo nut and bolt or wedge, just lock the blade into cup.
SampleFast and simple to erect with only four component fastenings.
Light Weight3.2mm thickness high-grade steel; 20% lighter than standard 4mm tubes.
EconomicalSystem uses only three main components.
Fast30%-50% faster than traditional scaffolding.
DurableHot-Dip-Galvanized provides a low maintenance, long life.
VersatileExtremely versatile for Facade, Shoring, Circular, Staircases, and Mobile Towers.
Cup-Locking Procedure
Cup Locking Procedure
Why Choose Our Scaffolding?
⚙️
High Standard Process: Q235 / Q355 ERW, enhanced corrosion resistance; 15 years lifespan.
🛡️
Safe and Reliable: Three-dimension axial force structure ensures high strength, good stability, and perfect auto-lock.
Quick Erection: Erection and disassembly rate is 3-5 times faster than conventional scaffolding.
💪
High Capacity Load: Joint connectors resist high bending, shearing, and torsion; load capacity 15% more than traditional systems.
Main Scaffolding Parts

Cuplock scaffolding includes Cuplock Vertical/Standard, Cuplock Ledger/Horizontal, Cuplock Brace, Cuplock Transom, Cuplock Hop-Up Bracket and Cuplock accessories.

Scaffolding Parts Map
Application Scenarios

Used in making advertising, painting ceiling, building construction, cleaning, repairing, suspending scaffolding, cantilever rack, bridging frame, curved frame and stage rack.

Application Scenario
Recommended: Aluminum Ringlock Scaffolding
Ringlock Features Details
Easy to StandInsert plugs into taper holes and tap tightly.
SimpleFast and simple with only three component fastenings.
Light WeightManufactured by aluminum alloy, lighter than standard steel tubes.
Fast30%-50% faster than traditional scaffolding.
Aluminum Ringlock
Certifications & Quality Control
Certificates
Our Scaffolding Range
Product 1
Product 2
Product Range
Packaging & Shipping
Packaging
Frequently Asked Questions (FAQ)
1. What about after-sales service?
All products are fully tested before dispatch with a traceability system. Contact our team with photos/videos of any issues for replacement or reasonable compensation.
2. What payment terms do you accept?
We primarily accept T/T and L/C; other terms are negotiable.
3. What is the Minimum Order Quantity (MOQ)?
Normally we accept one full container, but we are happy to communicate about quantities for special products.
4. Can we customize our company logo or name on products?
Yes, we can apply permanent logos or stickers to products based on your requirements.
5. How fast can you finish an order?
A production schedule is established once the order is confirmed to ensure meeting customer needs on time.
6. Are you able to provide engineered drawings?
Yes, we have professional engineers capable of designing the most challenging scaffolding access solutions.

Related Products