ABP Scaffolding ABP Scaffolding

Heavy Duty Scaffolding Pipe Joint Pin Connector Sleeve Coupler Scaffolding Joint Coupler

Still deciding? Get samples of $ !
Request Sample

Product Description

Overview Product Description Product Parameters Certifications Our Advantages Packaging & Shipping FAQ

Basic Info

Model NO.UTM-PS-031
MaterialSteel
TypeFixed
Structural StyleMulti-Pole Scaffolding
FrameworkCombined Scaffolding
Supporting ModeProjecting Scaffolding
Lapping FormDouble Scaffolding
Erection PositionExternal Scaffolding
Scaffolding Part TypeScaffolding Couplers
Construction PropertiesBuilding Scaffold
SteelQ235
StandardEn74-1/BS1139
Weight1kg
FinishZinc Plate or Hot Dipped Galvanized
Size48.3*48.3mm
Keyword01Sleeve Coupler
Keyword02Scaffolding Coupler
Transport PackageBag / Pallet
Specification25pcs/bag 50bag/pallet
OriginChina
HS Code7308900000
Production Capacity500000pieces/Year

Product Description

Heavy Duty Scaffolding Pipe Joint Pin Connector Sleeve Coupler scaffolding joint coupler

Heavy Duty Scaffolding Pipe Joint Pin Connector Sleeve Coupler

Sleeve Coupler is an external fitting which is used to connect two scaffolding tubes end to end. It is suitable for 48.3mm tube, supplied to EN74-1 B standard. Drop Forged and Pressed Steel are available.

  • Dimensions: 48.3mm
  • Material: Q235 steel
  • Nut: 21mm, 22mm, 23mm
  • Weight: 0.97-1.56kg or as per request
  • Standard: EN74, BS1139, CE and domestic standard (SGS tested)
  • Technic: Pressed
  • Surface Treatment: Self-color, Zinc plated, Hot dip galvanized
  • Color: Self-color(Black), White, Yellow
  • Style: British (can also produce German, American, Japanese, etc.)
  • Quality: Excellent bearing capacity, durable & stable
  • Price: Reasonable & competitive
  • OEM Service: Available
Scaffolding sleeve joint coupler dimensions

Sleeve Coupler Advantages

  • Plating finish is highly resistant to corrosion, extending service life.
  • Advanced thermal processing enhances reliability and operation security.
  • Optimized bolt capping design prevents losing the nut.
  • Equipped with 8.8 high-strength bolts.
Sleeve Coupler Detail View 1
Sleeve Coupler Detail View 2
Sleeve Coupler Detail View 3

Our pressed couplers are manufactured from premium Q235 steel plates, using advanced pressing processes, and finished with durable yellow/white color zinc surface plating.

Compared to forged couplers, pressed couplers offer a clear cost advantage and effectively resolve manufacturing limitations associated with conventional forging processes. Standardized with Q235, Q355, SPHC, and other top-tier steel plate grades, they are processed to fully meet BS EN74-1:2005 requirements through meticulous cutting, precision mold forming, high-grade galvanizing, and assembly.

Pressed Coupler Process Chart

Scaffolding Couplers Application Scenarios

  • High-rise building inside and outside grid scaffolding.
  • Formwork support main frame inside buildings, halls, bridges, viaducts, and tunnels.
  • Mobile work platforms designed for electromechanical installations, hull repairs, and overall renovation works.
  • Setting up temporary viewing stands and grandstands.
  • Site dormitories, construction warehouses, or industrial sheds.
Scaffolding installation scenario

Similar Products

Scaffolding connection components
Industrial scaffolding joint details
Scaffolding joint product range

Product Parameters

Material Specs Standards & Options
Material Q235
Standards BS1139, EN74
Surface Finish Zinc Plate, Hot Dipped Galvanized, gold color galvanized, self-coloured
Type Options Forged / Pressed
Weight As per customized requirements
Bolt Details 1/2", M14
Nut Sizes 17mm, 19mm, 21mm, 22mm, 23mm
Certification ISO9001:2000, CE, SGS

Scaffolding Couplers Sizes

Double Coupler Specifications Swivel Coupler Specifications
48.3mm * 48.3mm 48.3mm * 48.3mm
38mm * 48.3mm 38mm * 48.3mm
48.3mm * 60.3mm 48.3mm * 60.3mm
48.3mm * 89mm 48.3mm * 89mm
48.3mm * 63mm 48.3mm * 63mm
48.6mm * 48.6mm 48.6mm * 48.6mm
60.3mm * 60.3mm 60.3mm * 60.3mm

Certifications

Product quality test certifications

Our Scaffolding Products

Heavy duty scaffolding products 1
Heavy duty scaffolding products 2
Total scaffolding solution parts

Our Advantages

One-Stop Service

We provide a dedicated one-to-one service to our customers, answering calls and recording requests 24 hours a day. We address product questions dynamically, follow up on customer demands regularly, and guide online product installation at any later stage.

Strict supply chain management
Comprehensive inspection protocol

Packaging & Shipping

Safe scaffolding packing methods
Reliable shipping and container loading

Frequently Asked Questions

Q1.What about after-sales service?
All our products are fully tested before dispatch, and we have a strict traceability system. Please contact our after-service team with photos and videos if you experience any issues. We will provide new replacements or reasonable compensation based on mutual agreement.
Q2.What are the payment terms you can accept?
We accept T/T and L/C. Other payment options are negotiable.
Q3.What is your minimum order quantity (MOQ)?
Normally we accept orders starting from one full container, but we are open to communicating and accommodating different order quantities depending on specific scaffolding products.
Q4.Can we customize our company logo or name on the products?
Yes, we can apply a permanent logo or custom stickers directly on the products according to your specifications.
Q5.How fast can you finish the order?
We establish a customized timeline that matches our customers' target deadlines as soon as an order is confirmed, ensuring all production milestones are executed on schedule.
Q6.Are you able to provide engineered drawings if needed?
Yes, we have experienced professional engineers who are capable of designing access solutions for even the most challenging scaffolding requirements.

Related Products